Start-up SOH assessment
For a BESS restart: assess available capacity, continuous-power capability and the initial operating recommendation.
Start-up test inputs
Required fields form the minimum SOH calculation set.
Core capacity information
Optional start-up condition
Complete the required inputs
Enter rated and released energy, then run the assessment.
The interval appears after the required inputs are completed.
Why SOH needs more than a single voltage value
This module prioritises energy/capacity; voltage and temperature validate operating conditions and risk.
SOH ≈ actual released energy ÷ reference energy. With a consistent protocol, this is the most direct capacity evidence.
Short release energy, power, voltage, temperature rise and resistance are used for screening with a wider interval.
A one-time BMS test export or historical file can refine the assessment without a permanent online connection.
Market-specific Demo Report
The webpage language remains unchanged; the exported report uses the selected market and report language.
The demo generates a communication draft only. Compliance, certification, CE marking, UL listing and authority approval must be independently confirmed by qualified parties and local requirements.
