POST-STORAGE STARTUP

Start-up SOH assessment

For a BESS restart: assess available capacity, continuous-power capability and the initial operating recommendation.

Recommended flowSOH before energisationMissing fields are labelled
SOH moduleFull-discharge characterisation uses actual releasable energy to calculate SOH. Quick mode uses a start-up test only, so its uncertainty is higher.
Switch to calendar-ageing assessment →
01

Start-up test inputs

Required fields form the minimum SOH calculation set.

Awaiting assessment

Core capacity information

Optional start-up condition

Minimum dataRated releasable energy + full-discharge energy. Other fields support power and risk assessment.
Ready to assess?Results appear only after the assessment is started.
Post-start-up SOH conclusionCAPACITY & POWER READINESS
Full characterisation · higher confidence
—SOH %
Input required

Complete the required inputs

Enter rated and released energy, then run the assessment.

Predicted SOH interval—%

The interval appears after the required inputs are completed.

Available energy— kWh
Power capability— % rated
Electrical health— /100
03

Why SOH needs more than a single voltage value

This module prioritises energy/capacity; voltage and temperature validate operating conditions and risk.

Full-discharge characterisation

SOH ≈ actual released energy ÷ reference energy. With a consistent protocol, this is the most direct capacity evidence.

Quick start-up estimate

Short release energy, power, voltage, temperature rise and resistance are used for screening with a wider interval.

Project-based delivery

A one-time BMS test export or historical file can refine the assessment without a permanent online connection.

REPORT

Market-specific Demo Report

The webpage language remains unchanged; the exported report uses the selected market and report language.

Singapore BESS technical-assessment file structure · DEMOThe selected market structure and verification checklist will be applied without changing the webpage language.

The demo generates a communication draft only. Compliance, certification, CE marking, UL listing and authority approval must be independently confirmed by qualified parties and local requirements.